"scope": "Phase-1 transition alternative: shore -> single 6000XP AC-IN (permitted scenario)",
"ac_charge_dc_a": 115,
"pv_charge_dc_a": 125,
"ac_input_cap_a": 50,
"charge_voltage_worstcase_V": 58.4,
"ac_charge_eff_assumed": 0.92,
"ac_draw_full_charge_a": 30.4,
"ac_draw_le_input_cap": true,
"spare_for_loads_a": 19.6,
"pack_c_rate": 0.366,
"pack_charge_le_bms": true,
"branch": {
"gauge_AWG": "8",
"ocpd_A": 40,
"egc_AWG": "10",
"vdrop_pct": 0.197,
"length_ft": 10
},
"shore_scenarios": [
{
"shore_feed_a": 30,
"dc_charge_a_achievable": 113.4,
"loads_spare_a": 0.0
},
{
"shore_feed_a": 50,
"dc_charge_a_achievable": 115,
"loads_spare_a": 19.6
}
],
"vs_chargeverter": "Skips the EG4 Chargeverter GC + its DC tap; reuses the AC-IN branch (also needed for the generator).",
"nec_basis": "Grid -> inverter AC input = NEC 210/240 branch + the inverter's transfer switch; off-grid inverter does NOT export (no 705). AHJ must permit grid-on-AC-IN (the scenario premise)."
}