OverviewFilesCommitsIssuesDocsReleasesPeers

electrical-review / artifacts / results / 14_shore_acin.json

34 lines · json ref:
{
  "scope": "Phase-1 transition alternative: shore -> single 6000XP AC-IN (permitted scenario)",
  "ac_charge_dc_a": 115,
  "pv_charge_dc_a": 125,
  "ac_input_cap_a": 50,
  "charge_voltage_worstcase_V": 58.4,
  "ac_charge_eff_assumed": 0.92,
  "ac_draw_full_charge_a": 30.4,
  "ac_draw_le_input_cap": true,
  "spare_for_loads_a": 19.6,
  "pack_c_rate": 0.366,
  "pack_charge_le_bms": true,
  "branch": {
    "gauge_AWG": "8",
    "ocpd_A": 40,
    "egc_AWG": "10",
    "vdrop_pct": 0.197,
    "length_ft": 10
  },
  "shore_scenarios": [
    {
      "shore_feed_a": 30,
      "dc_charge_a_achievable": 113.4,
      "loads_spare_a": 0.0
    },
    {
      "shore_feed_a": 50,
      "dc_charge_a_achievable": 115,
      "loads_spare_a": 19.6
    }
  ],
  "vs_chargeverter": "Skips the EG4 Chargeverter GC + its DC tap; reuses the AC-IN branch (also needed for the generator).",
  "nec_basis": "Grid -> inverter AC input = NEC 210/240 branch + the inverter's transfer switch; off-grid inverter does NOT export (no 705). AHJ must permit grid-on-AC-IN (the scenario premise)."
}